Skip to content

Platform

The database migration platform built on evidence

Assess, convert, migrate and validate in one workspace, where every stage writes to the same run, so the numbers agree from start to finish.

1,036 of 1,036

tables migrated and validated, row counts equal

Example run · Migrations / ERP-Oracle to ERP-PG

ERP-Oracle to ERP-PG

Passed with warnings

Oracle Database 19c to PostgreSQL 16.4

  1. AssessmentReadiness 71/100, 1,036 tables in scope214 findings
  2. PlanApproved by Sarah Mitchell1 Oct 2026 16:20 UTC
  3. Code conversion540 of 540 converted, every AI conversion checked540 of 540
  4. Data copy43,100 rows/s average, 61,200 peak13h 48m
  5. Validation7 warnings accepted by Sarah Mitchell17,612 runs
  6. Cut-overDowntime 18 min4 Oct 2026 02:00 UTC

Capabilities

What does Datalobe do?

Each part reads from and writes to the same migration run, and each card shows its result from the example run.

  • Code-object conversion

    Procedures, packages, triggers and views. AI converts, every conversion is checked, and each object compiles on the target before deploy.

    Oracle

    NVL(l.LINE_AMOUNT, 0)

    PostgreSQL

    COALESCE(l.line_amount, 0)

    212 procedures, 96 functions, 24 packages, 88 triggers, 120 views.

    • 540 of 540 compiled before deploy
    • 540 of 540 converted
  • The migration itself

    Schema first, then data in checkpointed batches that resume after an interruption. CDC keeps the target in sync until cut-over.

    • SALES312
    • FIN248
    • INV196
    • HR142
    • COMMON138
    • 2,141,876,402 rows
    • 13h 48m data copy
    • 2 resumes
    • lag at cut-over 4 s
  • Code-object and data validation

    Every table: 17 checks in six groups. Every code object: present, compiled, and its function results compared.

    Passed with warnings

    1,036 tables validated

    • 17,605 passed
    • 0 failed
    • 7 warnings, accepted
    • 12,200 function calls, results equal
  • Assessment

    Inventory, readiness, findings and an effort estimate for every schema, before any work is planned.

    71of 100

    Findings
    214
    Estimate
    840 h
  • AI, with limits

    Fixed rules handle schema and data. AI converts stored code, and what cannot be proven goes to a named person.

    • Result columns match the source
    • Test-called on the target
  • Certificate of Migration

    One of five documents from the same run. Anyone can check it against Datalobe's records on a public verification page.

    Certificate of Migration

    Passed with warnings

    • Assessment Report
    • Migration Plan
    • Validation Report
    • Migration Report
    • Certificate of Migration
  • Deployment

    Datalobe Cloud, or self-hosted, single-tenant, on request. Datalobe reads the source with a read-only database user you create.

    • User DFLUX_RO
    • Read-only

One run

What happens in one run?

The example run, left to right: each stage hands the next one a record, and the Validation Report reads them all.

  1. Source

    Oracle Database 19c1,036 tables
  2. Connect

    Read-only userDFLUX_RO
  3. Assess

    Readiness71/100
  4. Convert

    Compiled540 of 540
  5. Migrate

    Data copy13h 48m
  6. Validate

    Table check runs17,612
  7. Report

    Validation ReportPassed with warnings

Demo

See Datalobe on your own schema

Book a demo, or send a read-only connection or schema export for a free Assessment Report.